Drop Forged Precision Formed Hot Titanium Alloy Die Forging Part for Mining

Products

Drop Forged Precision Formed Hot Titanium Alloy Die Forging Part for Mining

Drop Forged Precision Formed Hot Titanium Alloy Die Forging Part for Mining

Overview .lc-a-img { position: relative; width: 100%; height: 100%; object-fit: contain; overflow: hidden;}.lc-a-img .im

Send your inquiry

DESCRIPTION

  • Overview
  • Product Description
  • Company Profile
  • Packaging & Shipping
  • Certifications
  • FAQ
Overview
Basic Info.
Molding Technics Pressure Casting
Application Auto Shafts, Wind Power Spindles, Gears
Material Steel, Aluminum, Copper
Heat Treatment Quenching
Surface Treatment Powder Coating
Certification ISO 9001:2000
Advantages Much Stronger
Advantages1 High Toughness
Advantages2 Withstand Heavy Impact
Transport Package Carton/Wooden Cast/Pallet
Specification Customized
Origin China
Production Capacity 50, 000 PCS/Month
Product Description

Product Description1. Characteristics:Made by hot pressing metal, tight uniform interior, high toughness, simple shapes only, fewer internal defects.
2. Functions:Withstand heavy impact, torsion and repeated fatigue loads.
3. Applications:Auto shafts, wind power spindles, high-pressure fittings, aerospace safety parts, gears.
4. Advantages:Much stronger and more durable than castings, reliable for high-stress key components.
5. Disadvantages:Cannot make complex hollow structures, higher production cost.

Company Profile

Packaging & Shipping

Certifications

FAQ1. Are you a foundry manufacturer?
Yes, we are professional precision casting & machining factory, support OEM/ODM per your drawings.2. Can I get samples for testing?
Samples available, buyer covers sample charge & courier cost,
Casting: 40 working days preparation.
Forging: 35days
CNC: 10 around
3. Custom material & dimension acceptable?
Custom material (316L/8625/alloy steel etc.), size, tolerance, surface treatment per CAD drawings.4. How to get exact price?
Send drawing, material, quantity, surface requirement, we quote within 24-48 hours.5. Better price for bulk quantity?
Yes, unit price reduces with larger order volume.6. Payment & Order
Payment terms: T/T preferred. Small trial orders are welcome.7. Production & Shipment
Production lead time: Depends on quantity & processing.
Shipping: Sea freight / Air freight / Express.8. Quality Control
Full inspection on raw material, dimension, hardness before delivery; supply inspection report if needed.9. After-sales
If defects caused by our production, we offer remake, replacement or compensation.

Related Products